PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the lower roof Facing East.jpg Duct work fitters at the 3rd floor Facing West.jpg Framing aound the column at the 2nd floor Facing north.jpg Installing copper piping at the 2nd floor Facing South.jpg Installing ductwork at the 3rd floor Facing North.jpg Installing curtain wall mullions at the South Elevation.jpg
Previous pageNext page Installing ductwork at the 3rd floor Facing North
Installing ductwork at the 3rd floor Facing North